February - Finish/Driveway |
|||
![]() |
The first step in the finish work was a driveway, so we wouldn't track quite so much sand into the house. | ||
![]() |
![]() |
||
Next
came the hardwood floors. This is looking northwest from the library. |
In
this picture your're looking down the length of the house from the living
room. |
||
Once
the floors were down, we started installing cabinets. This is the kitchen
in early February. |
![]() |
||
![]() |
![]() At left, the kitchen in mid-February, and above, at the end of the month. |
||
Here's the master bath shower Ed had started on in the last page. |
Looking
south down the hall from the dining area. |
||
![]() |
These
last pictures are of the covered porch. |
||
|
|||