November - January -- Siding/Finish |
||
![]() |
In these pictures we've got a pretty good handle on the siding. As you can see, we were blessed with a pretty open winter. | |
![]() |
![]() |
|
Below is a shot of the back deck. |
![]() |
|
![]() |
Meanwhile,
the sheetrockers have been busy inside. |
|
![]() |
Ed Canepa has been working on the tile shower. Below is a detail of the
trim. |
|
|
||