Framing V

We're back at framing, now that our posts and beams are done -- at least for the moment.
Here Chad and Rob are working on the blocking just before we put plywood down on the subfloor. They're working over an area that will be exposed from below, but we're putting down temporary plywood so we can frame the angle walls.
Here you're looking at what will be the entry. That notch will be the front door.
In this picture and the one below, we're building a temporary scaffolding that will enable us to work on the rafter tails and overhangs.