![]() |
|
| We stood the wind frames up in late January and started framing the lower floor walls. The next step are the interior walls, top plates, brace and straighten, then start the floor joists for the main level, which you can see below. | |
![]() |
|
| Once the plywood subfloor was down, we started on the main floor walls, which start to frame the view the house will have. | |
![]() |
|
![]() |
|
|