![]() |
|
| We finally got our slabs poured. Now it's time for the steel wind frames that will give the house some sideways stability in high winds. Above they're being welded together and below they're being lifted into place with a truck crane. Once these are in place we'll start framing. | |
![]() |
|
|
|
![]() |
|
|