Finish II

That's Adam Best getting started with the oak floor in the upstairs bedroom.
Kay and Adam installing the floor in the kitchen nook and dining area.
Here's the cooking island ready for the black granite countertops. We'll need to make the sink cutouts before they install, but otherwise, we're ready.
Below is the installer from Firespaces, laying up the soapstone tiles on the wall, before installing the fireplace.

Another shot of the installation, this time in the downstairs game room, and above, the finished product.

That's a look at the living room fireplace from the dining room, with Jim's template in the foreground for gluing up the curved base we need on those curved walls up by the master bedroom.

It's now mid-November. We're really close to letting the painter start. The granite countertops should be installed momentarily. the game room floor gets finished so we can install the pool table the week of Thanksgiving.

Pretty soon we're going to have to look for a new home.